On Target

GI 2.4.1 Complete Stormwater Master Plan.

The purpose of the Engineering Stormwater Study is to identify public stormwater related problems and develop a Stormwater Master Plan to address flooding and water quality needs of the County. Regulatory and program requirements are evolving that will require new strategies to effectively address particularly with the expected development.

Flagler County
1769 E. Moody Blvd., Bldg 2
Bunnell, FL 32110
Contact 386.313.4000
https://www.flaglercounty.gov/